Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
Project: Mobily’s Data Center Building in Riyadh
Client: Mobily through MMR
Date: 2023
Description:
LEED Consultancy Services (LEED BD+C) and Conducting Energy Performance Simulation for Mobily’s Data Center Building in Riyadh.
Project: Mobily’s Data Center Building in Jeddah
Client: Mobily through MMR
Date: 2022
Description:
LEED Consultancy Services (LEED BD+C) and Conducting Energy Performance Simulation for Mobily’s Data Center Building in Jeddah.
Project: Project W
Client: WATG Shaker Consultancy Group
Date: 2025
Description:
Provide Energy Modelling for Project W in KSA which comprises a range of high-end hospitality and leisure assets, including a castle hotel and inner atrium, suites and residences, adventure centre, observatory/planetarium, indoor and outdoor sports centre, destination spa, amphitheatre, royal stables and pasture, and a wadi oasis. The total indoor built-up area across all facilities is approximately 647,194 m².
Project: Pyramids Plateau
Client: WATG (ThroughtShaker Consultancy Group)
Date: 2025
Description:
Provide a Sustainability Strategy and Principles for the Master Plan of the Priority Areas of the Pyramids Plateau.
Project: City Gate Sustainability Strategy
Client: DIAR QATARI through SITES International
Date: 2025
Description:
Preparation of Sustainability Strategy for the Masterplan of City Gate Project with Total Land Area of 8,489,090 m2.
Project: Green Building Certificate for beko (Arcelik)
Client: beko (Arcelik)
Date: 2024
Description:
LEED Consultancy Services (LEED BD+C) and Conducting Energy Performance Simulation for Beko plant in 10th of Ramadan.
Project: The Four Seasons Hotels Giza Pyramids Project
Client: TMG through Shaker Consultancy Group
Date: 2025
Description:
LEED Consultancy Services (LEED BD+C) for The Four Seasons Hotels Giza Pyramids Project.
Project: Mobily’s Data Center Building in Riyadh
Client: Mobily through MMR
Date: 2023
Description:
LEED Consultancy Services (LEED BD+C) and Conducting Energy Performance Simulation for Mobily’s Data Center Building in Riyadh.
Project: Mobily’s Data Center Building in Jeddah
Client: Mobily through MMR
Date: 2022
Description:
LEED Consultancy Services (LEED BD+C) and Conducting Energy Performance Simulation for Mobily’s Data Center Building in Jeddah.
Project: Mall of Egypt Business Park
Client: Majid Al Futtaim
Date: 2024
Description:
LEED Consultancy Services (LEED BD+C) and Conducting and Energy Modeling for Mall of Egypt Business Park. The project comprises two parcels directly connected to the Mall of Egypt consisting of high-profile office buildings, retail space, carpark and landscaping.
Project: Attijariwafa Bank New Head Office
Client: Attijariwafa Bank Egypt
Date: 2024
Description:
LEED Consultancy Services (LEED BD+C) and Conducting and Energy Modeling for Attijariwafa’s new headquarter building in the 5th Settlement, New Cairo (BUA: 15,000 m2).
Project: EUI & WUI for Selected Projects
Client: SODIC
Date: 2024
Description:
Calculating Energy Use Intensity (EUI) and Water Use Intensity (WUI) for Selected Projects by SODIC.
Project: Office Building in CityStars Kattameya Project
Client: ARCO Egypt
Date: 2023
Description:
LEED Consultancy Services (LEED BD+C) and Conducting and Energy Modeling for Office Building in CityStars Kattameya Project (BUA: 56,000 m2).
Project: Beko New Home Appliances Manufacturing Facility
Client: Arcelik Household Appliances Company
Date: 2022
Description:
LEED Consultancy Services (LEED BD+C) and Conducting and Energy Modeling for Beko’s New Home Appliances Manufacturing Facility in 10th of Ramadan.
Project: Allianz Head office in the New Administrative Capital
Client: Allianz through Archimid Consultants
Date: 2021
Description:
LEED Consultancy Services (LEED BD+C) and Conducting Energy Performance Simulation for Allianz Head office in the New Administrative Capital.
Project: Datacenter Building in Noor City
Client: Talaat Mostafa Group
Date: 2022
Description:
LEED Consultancy Services (LEED BD+C) and Conducting Energy Performance Simulation for Datacenter Building in Noor City to achieve LEED Platinum.
Project: Ansar Hospital in KSA
Client: Shaker Consultancy Group
Date: 2021
Description:
Project: Green Building Certification Consultancy for New University Campus in Assiut and Solar Energy Feasibility Study for Existing Badr University in Cairo
Client: EBRD
Date: 2019
Description:
Project: Multi-disciplinary national consultancy service to support in the preparation of the UNDP-GEF Green Sharm Project
Client: UNDP
Date: 2019
Description:
The project aims to make Sharm El Sheikh a model of sustainable tourism through reduced carbon emissions, sustainable water, effective waste management, and biodiversity protection. Scope includes national consultancy support for the GEF-UNDP project document and CEO endorsement, covering Energy, Biodiversity, Waste & Chemicals, and Gender.
Project: Sustainability and Environmental Consulting for El Masyaf Resort at the North Coast
Client: M2 Developments
Date: 2018
Description:
Developing Sustainable and Environment-friendly design guidelines for the Architects and Master Planners to follow, as well as review the iterations of the design to comment on the environmental and energy saving aspects, and propose innovative ideas for the use of renewable energy and other environment-friendly design techniques.
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Lusail Sky Tower – Waterfront Mix 16, Lusail City, Qatar
Client: ERGA Qatar
Date: 2017
Description:
GSAS 2* Certification
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Project Alar (5 Stars Hotel and Residences), Lusail City, Qatar
Client: WAT-G
Date: 2017
Description:
GSAS 2* Certification
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Marina MIX-011 Hotel &
Residences, Lusail City, Qatar
Client: Ehaf Consulting Engineers
Date: 2017
Description:
GSAS 3* Certification
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Milaha Logistics City Package 5&5A, Qatar
Client: Milaha Capital
Date: 2016
Description:
Client’s GSAS Representative for the Conformance to Design Audit Stage for GSAS 3* Certification
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Al Mazroa Laboratory Complex, Qatar
Client: Dara Engineering Consultants -ASHGHAL
Date: 2016
Description:
GSAS 3* Certification
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Fox Hills RES-A10, Lusail City, Qatar
Client: NQP
Date: 2016
Description:
GSAS 2* Certification
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Waterfront RES-27, Lusail City, Qatar
Client: NQP
Date: 2016
Description:
GSAS 2* Certification
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: Khalifa Stadium, Doha, Qatar
Client: Midmac-Sixco Joint Venture (MSJV)
Date: 2016
Description:
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: FOX Hills Res A-37, Lusail City, Qatar
Client: Al Hitmi Group
Date: 2016
Description:
GSAS 2* Conformance to Design Audit
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: FOX Hills MU E08, Lusail City, Qatar
Client: Al Hitmi Group
Date: 2016
Description:
GSAS 2* Conformance to Design Audit
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Project: FOX Hills RES Plot D-17, Lusail City, Qatar
Client: Al Hitmi Group
Date: 2016
Description:
GSAS 2* Conformance to Design Audit
Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
Contact us for sustainability consulting, environmental consulting, environmental engineering, and more. Optimize energy usage with a Home Energy Management System. Elevate efficiency through innovative Home Energy Management solutions.Efficient waste management solutions by Integral Consult. Experts in Municipal, Hazardous, and Industrial Solid Waste Management.Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.
+202 25204515 | info@integral-egypt.com
This website uses cookies. By continuing to use this site, you accept our use of cookies.