Integral Consult
Integral Consult
  • Home
  • About
  • Services
  • Projects
    • Climate Change
    • ESIA
    • Carbon Mechanisms&Credits
    • Green Buildings
    • Solid Waste Management
    • Energy Management
  • ESG Assessment Tool
  • News
  • Contact Us
  • More
    • Home
    • About
    • Services
    • Projects
      • Climate Change
      • ESIA
      • Carbon Mechanisms&Credits
      • Green Buildings
      • Solid Waste Management
      • Energy Management
    • ESG Assessment Tool
    • News
    • Contact Us
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About
  • Services
  • Projects
    • Climate Change
    • ESIA
    • Carbon Mechanisms&Credits
    • Green Buildings
    • Solid Waste Management
    • Energy Management
  • ESG Assessment Tool
  • News
  • Contact Us

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Environmental and Social Impact Assessment (ESIA)

A. Mobility

Cairo-Alexandria Freight Corridor, funded by the World Bank

Project: Cairo-Alexandria Freight Corridor, funded by the World Bank  

Client: ENR  

Date:  2022

Description:  

Environmental & Social (E&S) instruments are being prepared in line with World Bank standards for the Cairo–Alexandria Freight Corridor, covering three phases: Phase 1 (Manashy–6th of October, 49 km), Phase 2 (Itihad–Bashtil, 117 km), and Phase 3 (Tafaroa–Itihad, 123 km). Instruments include the ESIA, ESMF, SEP, LMP, RF, and ESCP.

ESIA for Electric Bus (e-bus) Demonstration Project

Project: ESIA for Electric Bus (e-bus) Demonstration Project, funded by the World Bank  

Client: The Ministry of Environment - Greater Cairo Air Pollution Management and Climate Change Project and Cairo Transport Authority (CTA)  

Date: 2022 – Ongoing 

Description:  

  • Conduct ESIA in line with World Bank standards and Egyptian environmental laws.
  • Develop accounting and measurement methodologies for GHGs and SLCPs, including Black Carbon.

Cairo Metro Line 6

Project: Cairo Metro Line 6   

Client: National Authority for Tunnels (NAT) through EGIS Engineering Egypt   

Date: 2022

Description:  

ESIA study for the Cairo Metro Line 6, which is about 30 km long (about 10 km elevated on a viaduct and 20 km underground) and serves 24 stations linking Al-khosos in the north of the metropolis to the suburb of Maadi in the south.

The Railway Corridor Alexandria - Nag Hammadi, Funded by the World Bank

Project: Environmental and Social Assessment documentation for Modernizing the signaling system along the railway corridor Alexandria - Nag Hammadi, funded by the World Bank  

Client: Egyptian National Railways (ENR)   

Date: 2020

Description: 

ESIA prepared under World Bank standards for modernizing the 760 km Alexandria–Nag Hammadi railway signaling system across five sections.


B. Solid Waste

ESIA for 10th of Ramadan Integrated Waste Management Facility

Project: ESIA for 10th of Ramadan Integrated Waste Management Facility, funded by the World Bank 

Client: The Ministry of Environment - Greater Cairo Air Pollution Management and Climate Change Project, funded by World Bank 

Date:  2022

Description:  

Preparation of an ESIA for the 10th of Ramadan Integrated Waste Management Facility, in compliance with the World Bank ESF, the Project’s ESCP, and Egyptian environmental regulations.

Qalyoubia Sanitary Landfill and shared C&D Treatment Facility (2020)

Project: Qalyoubia Sanitary Landfill and shared C&D Treatment Facility (2020) (Qalyoubia & Cairo Governorates)  

Client: The Ministry of Environment - Greater Cairo Air Pollution Management and Climate Change Project, funded by World Bank 

Date: 2020 

Description: Preparation of Environmental and Social Impact Assessment Study for Qalyoubia Sanitary Landfill & shared C&D Treatment Facility (2020) (Qalyoubia & Cairo Governorates) in compliance with the World Bank’s Environmental & Social standards.

Collection and transfer of solid waste at Madinaty Project

Project: Collection and transfer of solid waste at Madinaty Project  

Client: Talaat Mostafa Group  

Date:  2010 

Description:      

Preparation of Environmental Impact Assessment for the collection and transfer of solid waste at Madinaty Project.

Leachate evaporation ponds in Borg Al-Arab and Hamam Landfills

Project: Leachate   evaporation ponds in Borg Al-Arab and Hamam Landfills

Client: VEOLIA Environment  

Date: 2009

Description:       

Preparation of Scoped Environmental Impact Assessment Study.


C. Infrastructure

Sustainable Rural Sanitation Services Program

Project: Sustainable Rural Sanitation Services Program for Results (SRSSP_PforR), funded by the World Bank  

Client: Ministry of Housing, Utilities and Urban Communities (Sub-consultancy through TALAAT & IMAM Consulting Engineers)  

Date: 2021 

Description:      

Preparation of ESIAs and environmental supervision for 15 rural wastewater plants across six governorates, in line with World Bank and EEAA standards.

Co-generation Plant at DNM Textiles

Project: Co-generation Plant at DNM Textiles 

Client: DNM Textiles 

Date: 2022 

Description:   

Conducting Environmental Impact Assessment Study for Cogeneration Plant.

20 MW Solar PV Plant in Nabq Bay

Project: 20 MW Solar PV Plant in Nabq Bay 

Client: TAQA Power  

Date: 2022 

Description:      

Conducting Environmental Impact Assessment Study for 20 MW Solar PV Plant.

ASCOM Solar Plant

Project: ASCOM Solar Plant 

Client: TAQA Power   

Date: 2022 

Description:       

Conducting Environmental Impact Assessment Study for upgrading ASCOM Solar Plant.

3 Rooftop Solar Plants

Project: 3 Rooftop Solar Plants

Client: TAQA Power   

Date: 2022 

Description:       

Preparation of form B Environmental Impact Assessment Study for 3 rooftop Solar Plant.

TEMA Waste Water Treatment Plant

Project: TEMA Waste Water Treatment Plant 

Client: Shaker Consultancy Group 

Date: 2022 

Description:       

Preparation of B scoped Environmental Impact Assessment Study for TEMA WWTP.

5.5 MW Solar PV Plant in Soma Bay

Project: 5.5 MW Solar PV Plant in Soma Bay  

Client: Taqa Power  

Date: 2021 

Description:       

Conducting Environmental Impact Assessment Study for 5.5 MW Solar PV Plant in Soma Bay.

Tri-generation Plant

Project: Tri-generation Plant (15 TPH steam, 27 MW electricity and chilled water)  

Client: Korra Energi 

Date: 2021 

Description:       

Preparation of Environmental Impact Assessment Study for Tri-generation Plant in Abou Rawash, 6th of October City.

20 MW Co-generation Plant

Project: 20 MW Co-generation Plant  

Client: Hayat Kimya 

Date: 2020 

Description:       

Preparation of Environmental Impact Assessment Study for 20 MW Co-generation Power Plant inside Hayat Kimya’s manufacturing facility.


D. Industrial

ESIA, ESMP, and Grievance Mechanism for Expansions

Project: ESIA, ESMP, and Grievance Mechanism for Expansions by adding a biopharmaceuticals production project and vaccines using genetic engineering technology 

Client: Minapharm Pharmaceuticals 

Date:  2024 

Description:  

Preparation of ESIA, ESMP, and Grievance Mechanism for Expansions by adding a biopharmaceuticals production project and vaccines using genetic engineering technology according to African Development Bank Standards.

ESIA, ESMP, and Grievance Mechanism for Expansions

Project: ESIA, ESMP, SEP, and Grievance Mechanism for Expansion of Luna’s Manufacturing Facility 

Client: LUNA Company for Perfumes and Cosmetics 

Date:  2024 

Description:  

Preparation of ESIA, ESMP, SEP, and Grievance Mechanism for Expansion of Luna’s Manufacturing Facility according to IFE Standards.

Preparation of Action plan for utilization of RDF

Project: Preparation of Action plan for utilization of RDF 

Client: Egyptian Cement 

Date: 2022 

Description:  

Preparation Action Plan for utilizing RDF in Egyptian Cement.

Increasing RDF Percentage

Project: Increasing RDF Percentage  

Client: Al Nahda Industries 

Date: 2022 

Description:  

Preparation of Environmental Impact Assessment Study for increasing RDF percentage.

Hopper Feeding Area

Project: Hopper Feeding Area 

Client: Lafarge 

Date: 2022 

Description:  

Air Dispersion Modeling Study for Hopper Feeding Area.

Waste Heat Recovery Power Generation Project

Project: Waste Heat Recovery Power Generation Project 

Client: Helwan Cement Company – Heidelberg Cement Group  

Date: 2021 

Description:  

Preparation of an Environmental Impact Assessment Study for Waste Heat Recovery Power Generation Project at Helwan Cement Plant.

Coal Storage at Helwan Cement Plant

Project: Coal Storage at Helwan Cement Plant  

Client: Helwan Cement Company – HEIDELBERGCEMENT Group 

Date: 2020 

Description:  

Preparation of an Environmental Impact Assessment Study for Coal Storage at Helwan Cement Plant including Air Dispersion Model and a traffic impact study.

Compliance of Coking Coal Project with Equator Principles

Project: Compliance of Coking Coal Project with Equator Principles 

Client: Al Nasr Coke – Egypt

Date: 2019 

Description:  

Preparation of Report for assessment of Compliance of Coking Coal Project with the Equator Principles.

EIA (EIA environmental impact assessment)

New Factory for Nutritive Industries

Project: New Factory for Nutritive Industries 

Client:  AMES for Nutritive Industries through Howeedy Consultant 

Date:  2019

Description:  

Preparation of an Environmental Impact Assessment Study for biscuits, chocolates & sweets factory


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

4 Quarries (Limestone, Basalt & 2 Clay Quarries)

Project:  4 Quarries (Limestone, Basalt & 2 Clay Quarries) 

Client: Lafarge Cement Company 

Date:  2018

Description:  

Preparation of Environmental and Social Impact Assessment Studies for 4 Quarries (Limestone, Basalt & 2 clay) including the biodiversity aspects


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Saudi Plastic Factory

Project: Compliance of the Factory with Equator Principles

Client:  Saudi Plastic Factory – Egypt 

Date:  2017

Description:    

Preparation of Report for assessment of Compliance of Saudi Plastic Factory in Egypt with the Equator Principles


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

New Bypass Landfill at Suez Cement Company

Project: New Bypass Landfill 

Client: Suez Cement Company – Heidelberg Cement Group

Date:  2017

Description:  

Preparation of a scoped Environmental Impact Assessment Study for a new bypass landfill


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

New Cement Production Line at South Valley Cement

Project:  New Cement Production Line 

Client: South Valley Cement Company

Date:  2017

Description:  

Preparation of a full Environmental Impact Assessment Study and a Traffic Impact Study 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Replacement of ESP Filters with Bag Filters

Project: Replacement of ESP Filters with Bag Filters for Cement Line II in Suez Cement Plant  

Client: Suez Cement Company - Heidelberg Cement Group

Date:  2017

Description:  

Environmental Impact Assessment for Replacement of Main Raw Meal ESP Filter, Bypass ESP Filter and Cooler ESP filter with Bag Filters for Cement Line II in Suez Cement Plant  - Form “B” 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Replacement of Cooler’s ESP with Bag Filter

Project:  Replacement of Cooler’s ESP with Bag Filter in Kattameya Cement Plant 

Client: Suez Cement Company - Heidelberg Cement Group

Date:  2017

Description:  

Environmental Impact Assessment for Replacement of Cooler’s ESP with Bag Filter in Kattameya Cement Plant - Form “B” 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

New Cement Production Line at Sewedy Cement

Project: New Cement Production Line

Client: El Sewedy Cement Company

Date:  2017

Description:  

Preparation of a full Environmental Impact Assessment Study and a Traffic Impact Study


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

New Cement Production Line

Project: New Cement Production Line

Client: Egyptian Cement for Cement Projects Management 

Date:  2017

Description:  

Preparation of a full Environmental Impact Assessment Study and a Traffic Impact Study


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Diamond Ceramics Factory

Project:  Diamond Ceramics Factory

Client:  General Authority of Suez Canal Economic Zone 

Date:  2017

Description:  

Review of Environmental Impact Assessment Study for Diamond Ceramics Factory in Suez Canal Economic Zone


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


Huhtamaki Flexible Packaging Factory

Project: Huhtamaki Flexible Packaging Factory

Client: Huhtamaki Flexible Packaging Egypt

Date:  2017

Description:  

Environmental Impact Assessment for Huhtamaki Flexible Packaging Factory – Form “B”


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


New Coal Mill at Arabian Cement Company

Project: New Coal Mill 

Client:  Arabian Cement Company 

Date:  2017

Description:  

Preparation of an Environmental Impact Assessment Scoped Study


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


E. Development

Palace Resort in North Coast

Project: Palace Resort in North Coast 

Client: Emaar (Through Shaker) 

Date: 2022 

Description:    

Environmental Impact Assessment Study for the Palace Resort in North Coast.

Seashell Jetty and 2 Crossings

Project: Seashell Jetty and 2 Crossings 

Client: Middle East (New Giza) 

Date: 2022 

Description:    

Environmental Impact Assessment Study for Jetty and 2 Crossings in Seashell Project


Commercial Strip at the south border of Madinaty

Project: Commercial Strip at the south border of Madinaty 

Client: Talaat Mostafa Group 

Date: 2022 

Description:    

Environmental Impact Assessment Study for Commercial Strip at the south border of Madinaty.


Water Park Mall

Project: Water Park Mall

Client: Talaat Mostafa Group 

Date: 2022 

Description:    

Environmental Impact Assessment Study for Water Park Mall.


School in Soma Bay

Project: School in Soma Bay 

Client: Abu Soma 

Date: 2022 

Description:    

Environmental Impact Assessment Study for School in Soma Bay.


Gateway Mall in Al Rehab

Project: Gateway Mall in Al Rehab 

Client: Talaat Mostafa Group

Date: 2021 

Description:    

Environmental Impact Assessment Study for Gateway Mall in Al Rehab City.


EIA (EIA environmental impact assessment)

El Masyaf Resort, North Coast

Project: El Masyaf Resort, North Coast 

Client:  M2 Developments  

Date: 2018

Description:  

Preparation of a full Environmental Impact Assessment study in compliance with EEAA Standard


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Medical Center 3 at Al Rehab

Project: Medical Center 3 at Al Rehab 

Client: Talaat Mostafa Group  

Date: 2018

Description:  

Preparation of an Environmental Impact Assessment for Medical Center 3 at Al Rehab (Form B) 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Mall of Tanta

Project: Mall of Tanta 

Client: Marakez Through Shaker Consultancy Group   

Date: 2017

Description:  

Preparation of Environmental Impact Assessment study in compliance with EEAA and IFC Standards 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Four Seasons Hotel in Madinaty

Project: Four Seasons Hotel in Madinaty 

Client: Talaat Mostafa Group

Date: 2017

Description:  

Preparation of a scoped Environmental Impact Assessment study for Four Seasons Hotel in Madinaty 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Open Air Mall in Madinaty

Project: Open Air Mall in Madinaty 

Client: Talaat Mostafa Group

Date: 2017

Description:  

Preparation of Environmental Impact Assessment Study   for Open Air Mall in Madinaty according to IFC Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.

 

EIA (EIA environmental impact assessment)

Sector 4 Service Center in Madinaty

Project: Sector 4 Service Center in Madinaty 

Client: Talaat Mostafa Group

Date: 2017

Description:  

Scoped Environmental Impact Assessment study for sector 4 service center in Madinaty 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Food Court (1) in Madinaty

Project: Food Court (1) in Madinaty 

Client: Talaat Mostafa Group

Date: 2017

Description:  

Environmental Impact Assessment for Food Court (1) in Madinaty


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Beach Structures and Jetty at Soma Bay

Project: Environmental Compliance of Beach Structures and Jetty

Client: Abo Soma for Development

Date: 2016

Description:  

Preparation of an environmental impact assessment study for compliance of beach structures and jetty 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Office Park in Madinaty

Project: Office Park in Madinaty

Client: Talaat Mostafa Group 

Date: 2016

Description:       

Preparation of a scoped Environmental Impact Assessment Study for Office Park in Madinaty


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Taj City

Project: Taj City 

Client: Madinet Nasr Housing and Development 

Date: 2015

Description:  

Environmental Impact Assessment for Taj City  


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


Soma Bay Touristic Resort

Project: Soma Bay Touristic Resort

Client:  Abo Soma for Development  

Date: 2014

Description:  

Preparation of an environmental impact assessment study for the 10 million m2 development 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


Almaza City Center

Project:  Almaza City Center 

Client:   Majid Al-Futtaim (MAF) Egypt   

Date: 2014

Description:  

Preparation of Environmental Impact Assessment for Almaza City Center and an assessment report for compliance with Equator Principles


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


F. Oil & Gas

EIA Study for GASCO’s Natural Gas Network Reinforcement Project

Project: EIA Study for GASCO’s Natural Gas Network Reinforcement Project in 10th of Ramadan Industrial Zone

Client: GASCO 

Date: 2024 

Description:  

Category C Environmental Impact Assessment Study for the Natural Gas Network Reinforcement Project in the 10th of Ramadan Industrial Zone.

EIA (EIA environmental impact assessment)

El Tina – Abu Sultan – New Capital Gas Pipeline

Project:  El Tina – Abu Sultan – New Capital Gas Pipeline (42” – 165 km) 

Client:   GASCO 

Date: 2018

Description:  

Preparation of a Full Environmental Impact Assessment Study category “C”  in compliance with EEAA Standards 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Gasoil and LPG Pipelines connecting to the Grid

Project:  Gasoil and LPG Pipelines connecting to the National Grid  

Client:  Petrojet   

Date: 2016

Description:  

Preparation of a Full Environmental and Social Impact Assessment Study for 2 LPG Pipelines (4KM) and 1 Gasoil Pipeline (32 KM) in compliance with EEAA and World Bank Standards 


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Compliance with National Requirements

Project: Environmental Compliance with National Requirements 

Client:  Kuwait Energy through D’Appolonia    

Date: 2016

Description:  

Reviewing multiple ESIAs for offshore and onshore explorations to assure company’s compliance with the Egyptian Environment Law


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Gas Pipeline feeding 6th of October Power Station

Project: Gas Pipeline feeding 6th of October Power Station (400 M)  

Client:  GASCO –  Sub-consultancy

Date: 2016

Description:  

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.

 

EIA (EIA environmental impact assessment)

Gas Pipeline feeding Damanhour Power Station

Project:  Gas Pipeline feeding Damanhour Combined Power Station (4 KM)  

Client:  GASCO –  Sub-consultancy

Date: 2016

Description:  

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

3 Gas Pipelines feeding Mahmoudia Power Station

Project:  3 Gas Pipelines feeding El-Mahmoudia Power Station (7 KM, 15KM, 27KM) 

Client:  GASCO –  Sub-consultancy

Date: 2016

Description:  

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.

 

EIA (EIA environmental impact assessment)

Gas Pipeline feeding Suez Thermal Power Station

Project:  Gas Pipeline feeding Suez Thermal Power Station 

Client: GASCO - Sub-consultancy

Date: 2016

Description:  

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.

 

EIA (EIA environmental impact assessment)

Soumid Import Gas Pipeline

Project: Soumid Import Gas Pipeline (4 KM)

Client: GASCO - Sub-consultancy

Date: 2016

Description:  

Preparation of a Full Environmental Impact   Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

New Capital / Dahshour Gas Pipeline

Project: New Capital / Dahshour Gas Pipeline (115 KM)

Client: GASCO - Subconsultancy 

Date: 2016

Description:            

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


EIA (EIA environmental impact assessment)

Dahshour / El Wasta Gas Pipeline

Project: Dahshour / El Wasta Gas Pipeline (65 KM)

Client: GASCO - Subconsultancy 

Date: 2016

Description:  

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


El-Wasta / Beni-Suef Gas Pipeline

Project: El-Wasta / Beni-Suef Gas Pipeline (65 KM)

Client: GASCO - Subconsultancy 

Date: 2016

Description:  

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


El-Gameel / Damietta Gas Pipeline

Project: El-Gameel / Damietta Gas Pipeline (50 KM)

Client: GASCO - Subconsultancy 

Date: 2016

Description:  

Preparation of a Full Environmental Impact Assessment Study in compliance with EEAA and World Bank Standards


Elevate your projects with Integral Consult. Expert in Social Impact Evaluation, Environmental Social Impact Assessment, and Social Impact Assessment services.


Contact us for sustainability consulting, environmental consulting, environmental engineering, and more. Optimize energy usage with a Home Energy Management System. Elevate efficiency through innovative Home Energy Management solutions.Efficient waste management solutions by Integral Consult. Experts in Municipal, Hazardous, and Industrial Solid Waste Management.Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.

+202 25204515 | info@integral-egypt.com

  • ESG Assessment Tool

Powered by

Cookie Policy

This website uses cookies. By continuing to use this site, you accept our use of cookies.

Accept & Close