Integral Consult
Integral Consult
  • Home
  • About
  • Services
  • Projects
    • Climate Change
    • Carbon Mechanisms&Credits
    • ESIA
    • Env & Soc Due Diligence
    • Env & Soc Mangement Fra
    • Env & Soc Audits/Monitor
    • Constr Env Management
    • NAMAs
    • Sust & Green Building Cer
    • Solid Waste Management
    • Energy
    • Env Policies & Strategies
    • ESG
    • Cleaner Production
    • Water
  • ESG Assessment Tool
  • News
  • Contact Us
  • More
    • Home
    • About
    • Services
    • Projects
      • Climate Change
      • Carbon Mechanisms&Credits
      • ESIA
      • Env & Soc Due Diligence
      • Env & Soc Mangement Fra
      • Env & Soc Audits/Monitor
      • Constr Env Management
      • NAMAs
      • Sust & Green Building Cer
      • Solid Waste Management
      • Energy
      • Env Policies & Strategies
      • ESG
      • Cleaner Production
      • Water
    • ESG Assessment Tool
    • News
    • Contact Us
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About
  • Services
  • Projects
    • Climate Change
    • Carbon Mechanisms&Credits
    • ESIA
    • Env & Soc Due Diligence
    • Env & Soc Mangement Fra
    • Env & Soc Audits/Monitor
    • Constr Env Management
    • NAMAs
    • Sust & Green Building Cer
    • Solid Waste Management
    • Energy
    • Env Policies & Strategies
    • ESG
    • Cleaner Production
    • Water
  • ESG Assessment Tool
  • News
  • Contact Us

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Construction Environmental Management

Roads & Infrastructure in Doha Industrial Area – Package 01

Project: Roads & Infrastructure in Doha Industrial Area – Package 01 

Client: QTCG – MSF JV

Date: 2015 

Description:    

Construction Environmental Supervision.

Warehousing and Logistics Park at Um Shahreen 1, Qatar

Project: Warehousing and Logistics Park at Um Shahreen 1, Qatar

Client: ERGA Qatar 

Date: 2015 

Description:     

Preparation of the Construction Environmental Management Plan (CEMP).

Roads and Infrastructure for Government Residential Division Project

Project: Roads and Infrastructure for

Government Residential Division

Project in South of Wukair‐Package 2A Grading (QS036) 

Client: Buzwair Engineering and Contracting 

Date: 2015 

Description:  

Preparation of the Construction Environmental Management Plan (CEMP).

Grading of Roads and Infrastructure at Al Wukair South – Package 2B

Project: Grading of Roads and Infrastructure at Al Wukair South – Package 2B 

Client: MARBU 

Date: 2014

Description:  

Preparation of the Construction Environmental Management Plan (CEMP).

Demolition of Buildings Along A- Ring Road

Project: Demolition of Buildings Along A- Ring Road 

Client: MARBU 

Date: 2014

Description:  

Preparation of the Construction Environmental Management Plan (CEMP).

Contact us for sustainability consulting, environmental consulting, environmental engineering, and more. Optimize energy usage with a Home Energy Management System. Elevate efficiency through innovative Home Energy Management solutions.Efficient waste management solutions by Integral Consult. Experts in Municipal, Hazardous, and Industrial Solid Waste Management.Innovative solutions for green buildings and sustainable buildings by Integral Consult. Experts in sustainable and environmental buildings practices.

+202 25204515 | info@integral-egypt.com

  • ESG Assessment Tool

Powered by

Cookie Policy

This website uses cookies. By continuing to use this site, you accept our use of cookies.

Accept & Close